Sonia Avenue Stormwater Design

Location: Mermaid Waters, QLD
Project type: Engineering
Budget: $1M
Status: Completed
Organisation: City of Gold Coast

The Sonia Street project was initiated to overcome flooding to local residences that was occurring at a regular frequency. COMPLETE analysed the catchment which contributed to the flooding, and then developed design documentation for over one kilometre of stormwater infrastructure. All designed infrastructure was through existing suburbs, and avoidance of existing services was a constant challenge. A piled structure was required at the final stormwater outlet.