Streetscape Design

COMPLETE Urban have been engaged by Scenic Rim Regional Council to provide detailed design and documentation for the central median islands at Mt Tamborine sites at Master Plan level only.

COMPLETE are currently undertaking the following:

  • Stormwater Drainage Design
  • Pavement Design
  • Review of underground and overhead services
  • DDA Compliance and Crime Prevention Through Environmental Design (CPTED) Reviews
  • Definition of hard and soft landscape areas, retaining walls and street crossings.

A key design challenge is to resolve the level difference between each side ofthe medians and to activate the spaces safely from either side of Main St.