COMPLETE were engaged to produce architectural drawings and documentation to redevelop the original part of the building with new change rooms, toilets and showers for players and for public use and additional storage. The site is a sloping site and required a split level design solution where the public facilities are located at the upper level adjacent to the carpark and the changeroom facility on the lower level addressing the playing fields. COMPLETE provided a value added solution of an access path connecting the building to the adjacent sports hall.