Narrabri Depot

Location: Narrabri, NSW
Project type: Multidisciplinary
Budget: $20M
Status: Design Completed
Organisation: Transport for NSW

Following the successful completion of the TfNSW Depot master plan, COMPLETE URBAN (CU) have been engaged by TfNSW to prepare concept design and detailed design documentation.

A major component of this project is the relocation of existing office staff from rented office accommodation to new on-site office facilities to house up to 80 staff via permanent and hot desk arrangements. The site layout has also being optimised to accommodate the work flows of the depot works facilities to improve staff amenity, efficiency, safety, sustainability and public service functions.

The site upgrades includes:

  • Office and end of trip amenities Hub approx. 1100m2
  • Site maintenance workshop
  • Roads and traffic storage and loading facilities
  • Truck wash bay
  • Paint and chemical store
  • Laboratory
  • Site parking, road and stormwater infrastructure
  • Bulk materials and outdoor storage